*HEADING 1-d consolidation of a column of soil *preprint,echo=yes,model=yes,history=yes ** *NODE 1, 0.0, 0. 2, 0.5, 0. 3, 1.0, 0. 401, 0.0, 10. 402, 0.5, 10. 403, 1.0, 10. ********************* *NGEN, NSET=NALL 1, 401, 10 2, 402, 20 3, 403, 10 *NSET, NSET=NALLC, GENERATE 1, 401, 20 3, 403, 20 **--------------------- *NSET, NSET=BASE 1, 2, 3 *NSET, NSET=BASEC 1, 3 **--------------------- *NSET, NSET=TOP 401, 402, 403 *NSET, NSET=TOPC 401, 403 **--------------------- *NSET, NSET=VERBND, GENERATE 1, 401, 10 3, 403, 10 **---------------------------------------- *ELEMENT, TYPE=CPE8P, ELSET=ONE 1, 1, 3, 23, 21, 2, 13, 22, 11 *ELGEN, ELSET=SOIL 1, 20, 20 *ELSET, ELSET=TOP 20 **---------------------------------------- *SOLID SECTION, MATERIAL=A1, ELSET=SOIL *MATERIAL, NAME=A1 *POROUS ELASTIC ** kappa v 0.1, 0.3 **CLAY PLASTICITY, DEPENDENCIES=1 ** Lam M ao beta K T f1 ** 0.5, 1., 29., 1., 1., , 0. ** 0.5, 1., 5., 1., 1., , 10. ******************************************* *CLAY PLASTICITY, INTERCEPT=3.2773 ** Lam M ao beta K T 0.5, 1., , 1., 1., , ******************************************* *PERMEABILITY, SPECIFIC=10 0.11574E-7, ** *DENSITY 0.88 *INITIAL CONDITION, TYPE=RATIO NALL, 1.277, 0., 2.157, 10. *INITIAL CONDITION, TYPE=STRESS, GEOSTATIC SOIL, -60., 0., -10., 10., 0.6, 0.6 *INITIAL CONDITION, TYPE=SOLUTION, USER *INITIAL CONDITION, TYPE=FIELD NALL *BOUNDARY BASE, 1,2 VERBND, 1 401, 8 403, 8 **-------------------------------- *RESTART, WRITE, FREQUENCY=20 *STEP,NLGEOM .... GEOSTATIC STEP *GEOSTATIC *FIELD,VARIABLE=1, USER **NALL ** ** surcharge load ** *DLOAD 20, P3, 10. ** ** Gravity load **-------------------------------------- *DLOAD SOIL, GRAV, 10., 0., -1., 0. **-------------------------------------- *EL PRINT, POSITION=CENTROID, ELSET=SOIL S, *EL FILE, ELSET=SOIL S, *NODE PRINT,NSET=NALL U, POR *NODE FILE,NSET=NALL U, POR *MONITOR, NODE=401, DOF=2 *END STEP **-------------------------------------- ** ** step 2 : load application + 100 KPA (Total=110) ** *STEP,NLGEOM, AMPLITUDE=RAMP **------------------------------- ** SET UP INITIAL PORE PRESSURES **------------------------------- *SOILS,CONSOLIDATION 50.0, 500.0 *DLOAD 20, P3, 110. *NODE PRINT, FREQUENCY=5,NSET=NALL U,RF,POR,RVT *EL PRINT, FREQUENCY=25, POSITION=CENTROID S, E *EL FILE, FREQUENCY=25, POSITION=CENTROID S, E *NODE PRINT, NSET=TOPC U, POR ** *END STEP **------------------------------- ** CONSOLIDATION **------------------------------- ** *STEP,NLGEOM,INC=200 consolidation ** *SOILS,CONSOLIDATION, UTOL=10 1, 5.0E8, 1.E-5, ** *BOUNDARY TOPC, 8, 8, 0. ** *NODE FILE, NSET=NALLC, FREQUENCY=20 U, POR *NODE PRINT, NSET=NALLC, FREQUENCY=20 U, POR *EL PRINT, FREQUENCY=25, POSITION=CENTROID, ELSET=SOIL S, E, VOIDR *EL FILE, FREQUENCY=25, POSITION=CENTROID, ELSET=SOIL S, E, VOIDR *MONITOR, NODE=401, DOF=2 *END STEP