*HEADING 1-D Consolidation under surcharge Modified Cam-Clay Model Units : Length - m Force - kN Time - s *ELEMENT, TYPE=CPE8P, ELSET=ONE 1, 1, 3, 23, 21, 2, 13, 22, 11 *ELGEN, ELSET=SOIL 1, 20, 20 *ELSET, ELSET=TOP 20 *ELEMENT, TYPE=CPE8, ELSET=MAST 21, 401, 403, 423, 421, 402, 413, 422, 411 *ELGEN, ELSET=SURCH 21, 10, 20 ********************* *NODE 1, 0.0, 0. 2, 0.5, 0. 3, 1.0, 0. 401, 0.0, 10. 402, 0.5, 10. 403, 1.0, 10. 601, 0.0, 15. 602, 0.5, 15. 603, 1.0, 15. ********************** *NGEN, NSET=NALL 1, 601, 10 2, 602, 20 3, 603, 10 *NSET, NSET=NALLC, GENERATE 1, 401, 10 3, 403, 10 **--------------------- *NSET, NSET=BASE 1, 2, 3 **--------------------- *NSET, NSET=TOP 401, 402, 403 *NSET, NSET=TOPC 401, 403 **---------------------------------------- *SOLID SECTION, MATERIAL=A1, ELSET=SOIL *SOLID SECTION, MATERIAL=EMBANK, ELSET=SURCH *MATERIAL, NAME=A1 *POROUS ELASTIC 0.1, 0.3 ***CLAY PLASTICITY, DEPENDENCIES=1 ** 0.5, 1., 29., 1., 1., , 0. ** 0.5, 1., 5., 1., 1., , 10. *CLAY PLASTICITY, INTERCEPT=3.27726 0.5, 1., , 1., 1.,, *PERMEABILITY, SPECIFIC=10 0.11574E-7 **========================================= ** density 0.939 at y = 0. (base) ** 0.829 ay y = 10. (top) **========================================= *DENSITY, DEPENDENCIES=1 0.939, 0., 0. 0.829, 0., 10. ** *USER OUTPUT VARIABLES 10 ** *MATERIAL, NAME=EMBANK *ELASTIC 1.E5, 0.25 *DENSITY 2.0 *INITIAL CONDITION, TYPE=STRESS, GEOSTATIC, USER *INITIAL CONDITION, TYPE=RATIO, USER ** **INITIAL CONDITIONS, TYPE=FIELD, USER ** **INITIAL CONDITION, TYPE=STRESS, GEOSTATIC **SOIL, -60., 0., -10., 10., 0.6, 0.6 *INITIAL CONDITION, TYPE=PORE PRESSURE NALLC, 100., 0., 0., 10. **INITIAL CONDITION, TYPE=RATIO **NALLC, 1.277, 0., 2.157, 10. ** *BOUNDARY BASE, 1,2 NALL, 1 401, 8 403, 8 **-------------------------------- *RESTART, WRITE, FREQUENCY=20 *STEP,NLGEOM .... GEOSTATIC STEP *GEOSTATIC *FIELD,VARIABLE=1, USER NALL *DLOAD 20, P3, 10. *DLOAD SOIL, GRAV, 10., 0., -1., 0. *MODEL CHANGE, REMOVE SURCH **------------------------------- *EL PRINT, ELSET=SOIL S *EL FILE, ELSET=SOIL S *NODE PRINT,NSET=NALL U, POR *NODE FILE,NSET=NALL U, POR *MONITOR, NODE=401, DOF=2 *END STEP **------------------------------- ** ** step 2 : load application + 100 KPA (Total=110) ** *STEP,NLGEOM, AMPLITUDE=RAMP, INC=100 **------------------------------- SET UP INITIAL PORE PRESSURES **------------------------------- *SOILS,CONSOLIDATION, UTOL=100 5.0, 5000.0, 5.E-5, *DLOAD 30, P3, 10. *MODEL CHANGE, ADD SURCH *DLOAD SURCH, GRAV, 10, 0, -1, 0 ** *NODE PRINT, FREQUENCY=5,NSET=NALL U, RF, POR, RVT *EL PRINT, FREQUENCY=25, POSITION=CENTROID S, E *EL FILE, FREQUENCY=25, POSITION=CENTROID S, E *NODE PRINT, NSET=TOPC U, POR ** *END STEP **------------------------------- ** step 3 - CONSOLIDATION **------------------------------- ** *STEP,NLGEOM, AMPLITUDE=RAMP, INC=200 consolidation ** *SOILS,CONSOLIDATION, UTOL=10 1.E-8, 5.0E10, ** *CONTROLS, PARAMETERS=FIELD, FIELD=DISPLACEMENT ,0.7, *BOUNDARY TOPC, 8, 8, 0. ** *NODE FILE, NSET=NALLC, FREQUENCY=20 U, POR *NODE PRINT, NSET=NALLC, FREQUENCY=20 U, POR *EL PRINT, FREQUENCY=25, POSITION=CENTROID, ELSET=SOIL S, E, VOIDR *EL FILE, FREQUENCY=25, POSITION=CENTROID, ELSET=SOIL S, E, VOIDR *MONITOR, NODE=401, DOF=2 *END STEP